Looking for Canadian Water Savings?

16-Unit Apartment Building

Flow Dynamics, LLC

Property Details

Property Name Orange Apartment Building
Location 500 Main Street, Orange, NJ
Property Description Apartment – 16 Units
Water Source/Provider Municipal
Meter Size 1″
Source Managing Agent

 

Consumption Data

Prior to Installation

Dates/Time Period Gallons Per Diem
2/15/13 – 11/13/13 3,860

 

After Installation

Dates/Time Period Gallons Per Diem
11/13/13 – 9/2/14 2,842

 

Comments

Occupancy remained constant – minimal turnover. No central AC.

Results Summary

Reduction Percentage 26%
Utility Rate $7.18/CCF
Annual Gallons Saved 371,000
Dollars Saved $3,566
Payback Months 8 months

 

Chart: Gallons Per Day – Before vs. After

Chart: Annual Water Cost – Before vs. After

Building Photo

See If Your Property
Qualifies for 15%–35% Water Savings

If your facility has high water usage, a water bill review is the first step in determining whether system-level optimization is appropriate.

There is no obligation beyond the review. The objective is straightforward: identify whether meaningful, measurable water savings can be achieved for your property.

Qualified businesses must spend over $4,000 USD per month on average on water and sewage.